This document has expired, therefore the above link may no longer work.
Work of the contract will consist of the demolition and replacement of the existing built-up roof system sections with a new built-up roof system: 8A (approx. 6,800 SF), 8B (aprox. 1,050 SF), 8C (approx. 3,650 SF) and 9 (approx. 4,500 SF)