The project consists of fixed aluminum outdoor bleacher system, foundations, new/ modifying existing walkways, and new/ modifying existing fencing. The fixed outdoor bleacher system shall provide seating for 905 standard seats and 12 wheel chair spac-es. The project will require minor amounts of site demolition and modifications to existing underground stormwater piping.