This document has expired, therefore the above link may no longer work.
Request for Prequalification Information (RFPQ) for the Multi-Facility Design, Implementation, and Maintenance of a Replacement Toll Collection and Audit System, with Capability for Future All-Electronic Tolling, at Port Authority Crossings