The USDA Forest Service, Nantahala Ranger District, has a requirement for the removal of an existing culvert and installation of an AOP culvert on teh East Fork of Moses Creek.
The magnitude of this project will be: FAR 36.204 (c) Between 100,000 and $200,000
BONDS REQUIRED
FAR 52.228-1 Bid Guarantee (Sept 1996)
A Bid Guarantee will be submitted with the offer.
FAR 52.228-15 Performance and Payment Bonds-Construction
A Performance Bond will be required prior to commencement of work.
The entire Solicitation Package will be posted on July 6, 2017.
Takele K. Woldu, Contract Specialist, Phone 8282574205, Fax 8282574876, Email twoldu@fs.fed.us - Keith David Friot, Phone 8282574292, Email kfriot@fs.fed.us