DUMMY SYNOPSIS. NO SYNOPSIS IS REQUIRED IAW FAR 5.202(a)(13)(i), which provides the contracting officer need not synopsize when the proposed contract action is for an amount not expected to exceed the simplified acquisition threshold.
Louis A. Colon, Contracting Officer, Phone (405) 734-8116, Email louis.colon.2@us.af.mil