THE SOLICITATION FOR THIS PROJECT MAY BE POSTED ON OR BEFORE
JULY 21, 2014
The Umatilla National Forest, Walla Walla Ranger District, is in need of the restoration of 3.875 miles of existing single track motorcycle trail, the Middle Point Ridge Trail, #3116. Works consists of log out, brushing existing trail and drainage structure restoration, rock removal, berm and slough removal, switchback restoration, and rolling grade dip construction. Project is located 22 miles southeast of Dayton WA off FSR 64 on the road to Ski Bluewood.
Project is estimated at $25,000 - $100,000. Davis Bacon Wage Rates apply and an alternative payment protection from the awardee.
Susan Domina, Contract Specialist, Phone 541-523-1263, Fax 541-523-6393, Email [email protected] - Lorrie D. Hill, Procurement Technician, Phone (541) 523-1233, Fax (541) 523-6393, Email [email protected]