Phase III MetroBus Stop Improvements will consist of the removal and replacement of existing concrete sidewalks, installation of new concrete pads for bus deployed wheel chair ramps, concrete pads with benches, ADA curb ramps, bus stop sign posts, Braille plates, backfill, seeding and other incidental items.
Metro will furnish the benches, sign posts and Braille plates for the Contractor to assemble and install.