This document has expired, therefore the above link may no longer work.
At Air Handling Units (AC) #1, 2, 3, 5 and #6- Remove and replace the control valves with new 3-way control valves, remove and replace shut-off valves and remove and replace hydronic specialties at the chilled water coils.