The work to be performed within 25 working days from the date of commencement under this contract shall include, but not be limited to: removing sediment from the Creek Sediment Basin and the Creek Sediment Basin, constructing a flow bypass dam and diverting the creek into an existing bypass pipe, removing approximately 1,000 cy of sediment from each basin, hauling and
disposing of the sediment off-site, restoring flow to the sediment basin and removing the bypass dam, channel and vegetation maintenance in the channel, restoration, including hydroseeding around each basin and cleanup.