Manufacture, supply and delivery of Switches, crossings, Lead rails and fittings,fastenings in connection with Project Management,Construction of Coal,Lime Transportation System for Bongaingaon Thermal Power Project ( 3 x 250MW) Dist-Kokrajhar, Assam.