This document has expired, therefore the above link may no longer work.
Non-mandatory pre-bid meeting 04/29/2010.
The project consists of dredging approximately 2,500 cubic yards of silt material in the existing boat ramp. The work includes a dewatering process using Geotextiles tubes.