This Amendment is extending the proposal due date to 24 April 2018. Please see attached Amendment SF30 "W912ER-18-R-0004-0005" for more details.
Documents for this Amendment include:
"UD 2.4 Package 1 LSA Drawings 1"
"UD 2.4 Package 1 LSA Drawings 2"
"AM5 Specifications"
"W912ER18R0004-0005"
SSG Tyson Ornelas, Phone 540-665-2636, Email tyson.g.ornelas@usace.army.mil - Kenneth G. Baker, Phone (540) 665-2607, Email Kenneth.G.Baker@usace.army.mil