Installation of individual air conditioning systems in five (5) vertically stacked computer lounges.
Scope to include an indoor (evaporator) unit in each lounge with outdoor (condensing) units on
the roof above, power and control wiring to each unit, core drilling of floors for vertical piping and
wiring, and sheet rock enclosures to conceal vertical piping and wiring.