This project is for repair of an eroded drainage channel along MD 4 (Baltimore Annapolis Boulevard) just east of the
Crain Highway Bridge. The scope of work includes installation of a combination of open channel and closed st.orm drain system down the existing slope. A scour hole will be constructed at the new outfall. As part of the repair, voids in an existing 48" x 54" CMP culvert under MD 4 will be repaired. Landscaping will also be installed along the project limits.