Mandatory prebid conference on June 21, 2010. The Arena is soliciting bids to furnish and install luminescent type step nosing for all concrete steps in the Halton Arena; additionally, all aluminum retractable steps require matching step contrast strips. This bid is being issued to acquire design layout, specifications, cost breakdown ( to include labor and material), and timelines for supplying and installing photoluminescent-type step edging (non-powered) for the concrete and aluminum steps inside of Arena.