The Town desires to site, permit, and design a new subaqueous water transmission main under Longboat Pass. The water main would start from the Manatee County bulk water meter on Coquina Beach to the existing water meter on the North end of Longboat Key. The Town intends to make this new pipeline its primary water transmission main. Accordingly the Town expects that this new line would be able to survive a major hurricane making a direct hit to the Pass. The two existing water transmission mains are susceptible to scour.
The successful Responder will provide planning, permitting, design, bidding services, and project administration for the new subaqueous water transmission main. Tasks within this project include, but are not limited to:
Pipeline Alignment Options
Intergovernmental Coordination
Geotechnical Evaluation
Permitting Assistance
Project Area Survey
Hydraulics, as required