Note: must register at site to access full RFP (registration is free).
The scope of work under Schedules A, B, C, D, E and F shall include but is not limited to the following:
1. Cold Milling Asphalt Pavement
2. Repair Surface Cracking
3. Fiberglass Grid reinforcement
4. Subgrade Excavation and Granular Base Course placement
5. Level Course of Asphalt Concrete Pavement
6. Asphalt Concrete Pavement Overlay
7. Line Painting