The project consists of: Clearing and grubbing of the site, grading, gravel roadway and pad, stormwater management, stormwater pipes and erosion control measures, design and construction of a 2 story live fire simulator building that meets or exceeds the Virginia Department of Fire Programs and all other applicable federal, state and local regulations, specifications and standards for fire training simulators.