The scope of work to be performed under this contract consists of the furnishing of all materials and the construction, complete in place, approximately 3,700 linear feet of 42-inch sewer, including manholes, mitered bends, diversion structure, surface restoration, and incidental items of work as shown on the contract drawings for Contract no. 20-4531, specified in the contract documents, or as directed by the Engineer. This project is in Cost Group G. Each bid shall be accompanied by a Bid Bond or Certified Check in the amount of 5% of the total bid, made payable to the Director of Finance, Howard County. The County anticipates a notice to proceed with construction on or about January 7, 2009.
Bid documents for the subject solicitation will be available beginning October 15, 2008 for a non-refundable fee of $50.
A Pre-bid meeting will be held in the Engineering Conference Room, Dorsey Building, 9250 Bendix Road, Columbia, MD 21045 at 10:00 AM on October 28, 2008.