The project will include but not limited to the following major categories of work:
Improvements to the lime sludge basins driveway and overflow weirs to prevent storm water intrusion from the nearby drainage ditch.
TIME LIMIT: This project carries a time limit until December 31, 2010. Copies of the drawings, specifications, and other contract documents are on file and available for
public inspection at the Public Works Department, Engineering Division, 1101 Poyntz
Avenue, Manhattan, Kansas, 66502. Interested bidders may secure a set of drawings,
specifications and all other contract documents upon payment of a non-refundable fee of $25.00 by contacting Chrissy Kramer in the Public Works Department Utilities Division at 785-587-4530 or by email at [email protected].
Question concerning this bid should be directed to the Project Manager Robert Pugh
(785)587-4530, or by email at [email protected].