The work includes, but is not limited to, extension of an existing sewer force main with approximately 1,000 feet of new pipeline; installation of a precast vault and plug valve; electrical improvements for the motor operated valve, combined sewer and storm drain pipeline installation; catch basin installation; paving of the site; and management of three sources of water (sanitary flows, stormwater flows, and groundwater).