The project involves the alteration of portions of the second floor of the Library, which includes: the relocations of the Center for Reading and Writing into two bays (900 square feet each); and the replacement of the automatic doors to the terraces on the second floor. Bids will be received for a single contract covering all work indicated in the construction documents.