Work includes but is not limited to:
1. Demolitions of existing bathroom including concrete floor and buried waste piping
2. Demolition of masonry walls between existing bathroom and offices
3. Concrete floor and insulation
4. Interior walls, including doors. Also replace doors at Loading Dock.
5. Drywall work
6. Painting
7. Ceramic tile
8. Plumbing and heating installation
9. Electrical branch circuits, lighting, equipment connections