Contractor shall furnish all plant, labor, equipment, tools, materials, supplies, supervision, and any incidentals necessary to provide Landscaping as indicated in the Statement of Work (SOW) and Drawing. The work involves demolishing exiting asphalt at the worksite, excavating existing grounds at the worksite, and landscaping to include planting six (6) types of plants and the placement of river rocks IAW the SOW and Drawing. The work is to take place on Goodfellow AFB, San Angelo, TX 76908.