The project shall consist of the construction and installation of the polymeric marine mattress, clearing and grubbing, regrading of slopes, disposal of waste material excavated, providing and placement of soils for 24-inch final cover, permanent grassing, erosion and sedimentation measures, permanent access road construction, and resurfacing and repairing the existing asphalt