Note: must register at site to access full RFP (registration is free).
The nature of this project shall be to load / transport 1 km, approx. 1250 M3 of topsoil / Dirt cover. Stripping and preparation of the receiving property to completely cover existing ACP/CONCRETE will also be required.
Completion of this project shall be within 30 days from award of contract.