Work is to include but not be limited to intake screens and intake pipeline, air piping, valves, and all incidental items required for a completely functioning intake water system. The Project consists of an intake system that allows for draw-off in the reservoir to the Water Treatment Plant. The construction will include one (1) intake screen, one (1) check valve, and (1) butterfly valve.