Prepare contract documents for the renovation of Lab Pods 4A, 4B, 4C, and 5B in the Kenan Lab Building. The project will include the demolition of existing partitions and doors within the lab footprint; removal of existing casework including all associated conduit and plumbing; removal of all existing fume hoods including all ductwork back into shafts; removal of all existing supply and return air ducts; removal of all existing student carrels