The RFP Database
New business relationships start here

Lab and Office Space Build Out


Texas, United States
Education : University
RFP
Go to the link
This document has expired, therefore the above link may no longer work.

The scope of the project will include the design and construction of a Good Manufacturing Practice (GMP) Laboratory, Quality Control Laboratory, Accessioning, Inventory Supply, dedicated BioArchive tank area and a -80 Freezer Farm. Auxiliary spaces are to include, but not limited to, a reception area, administrative offices, a conference room and related support spaces to be built-out, or refinished, within the Medical Support Facility. In addition, the scope of work will also include design of a small service yard to include an emergency generator, chillers, a liquid nitrogen delivery system; these areas and access drives are not currently designed.

    1. Home
    2. Articles
    3. Login or Register

    4. Search

    5. Add/Announce your RFP