The RFP Database
New business relationships start here

LANDSCAPE MAINTENANCE


Washington, United States
Government : County
RFP
Go to the link
This document has expired, therefore the above link may no longer work.

The contractor is responsible for removing and properly disposing of all clippings or other debris generated
during the performance of this contract.
Damage to existing irrigation equipment or other appurtenances must be promptly reported to the City’s Project
Manager and shall be repaired in a timely manner by the contractor, at their expense.
Herbicide or pesticide application must be performed by a WSDA licensed applicator.

Additional docs: http://everettwa.org/default.aspx?ID=1819

    1. Home
    2. Articles
    3. Login or Register

    4. Search

    5. Add/Announce your RFP