Mandatory pre-bid meetings: 4/6/10 at 10 am or 4/8/10 at 10am.
Purpose or Bid Request:
To solicit pricing for kitchen renovations; Oak, Maple, Pine and Spruce units.
Cabinets as specified in attached.
Specific countertops, recently installed, will be re-used. These areas will be clearly identified at the
mandatory pre-bid walkthrough.
Countertops as specified in attached for all remaining cabinets..
Cabinet and countertop locations will be clearly delineated during the mandatory pre-bid.
Please see overhead view prints with all locations identified, attached.
Existing sinks and faucets are to be re-used.