The Contractor shall provide a self-propelled lift-vessel capable of operating within 50- feet of water in order to support drilling operations within Jacksonville Harbor. The purpose for using a lift-vessel is to provide a safe, stable, work platform for USACE drilling crews while drilling operations are underway. The lift- vessel shall be fully manned and capable of supporting
drilling operations along the St. Johns River within the port of Jacksonville, FL. The estimated number of days to complete the drilling mission, including weather delays, is 169 days; this does not include the time to mobilize the vessel to the Port of Jacksonville, FL. The estimated number of days may change depending on customer needs. The Contractor shall also
supply a crew boat to transport the drilling crew and any supplemental supplies to and from the lift-vessel; a crane capable of lifting up 15,000lbs to load and unload drill rig and supplies. The Contractor is to supply adequate dock
space to load and unload necessary supplies and equipment for use in the proposed contract.
Nikisha V. Weston, Phone 9126525102, Email [email protected]