The work includes but it is not limited to the following: site development with demolition, excavation and removal of impacted soils, corrosion control, transportation and disposal of excess hazardous waste (soil) material, constructing sidewalks and curbs, dewatering, grading, fill, drainage system, foundations, utilities, pavement, striping, lighting, signage, irrigation and landscaping. construction of a bus yard with parking for 165 forty foot motor coaches, construction of a fuel/wash building with 3 bays for fuel, lube and wash of vehicles, tire shop, fare collection system, and wash water reclaim system, construction of an annex building with offices, restrooms, lockers, lunchroom,system room, electrical room, emergency generator, and unit substation, construction of a shoreline park, and installation od an art structure.