The proposed work includes the following items and approximate quantities:
Schedule 1 – Base Bid Phase 1 – Taxiway D – Phase 3 - Civil Construction
Construct Taxiway D Concrete Pavement (16-Inch-25,776 S.Y.), including Econocrete,
Aggregate Base Course, Soil Stabilization Material, Geotextile Fabric, 12� Composite
Edgedrain, Taxiway Lighting, Removal and Salvage of Chain Link Security Fence and
Miscellaneous items.
Schedule 1 – Base Bid Phase 2 – Commercial Service Apron – Civil Construction
Construct Commercial Service Apron in Concrete Pavement (16-Inch-11,700 S.Y.), including
Econocrete, Aggregate Base Course, Soil Stabilization Material, Geotextile Fabric, 12�
Composite Edgedrain and Miscellaneous items.
Schedule 2 – Base Bid Phase 1 – Electrical Construction
Install Taxiway Lighting, #8, 5kV, L-824 Type C Cable, Solid Bare Counterpoise