Mandatory pre-bid conference 06/24/2010.
In general, the project includes installation of one (1) 70 ton, air cooled, 3 phase, 460 volt chiller at the Main Police Station and one (1) 90 ton City provided, air cooled, 3 phase, 460 volt chiller at the Central Fire Station.