Mandatory pre-bid meeting 01/19/2010.
This project includes, but is not limited to, a poured in-place 1.5" thick rubber surface, 4" thick reinforced concrete base, 2" sand leveling course, stand-up reinforced concrete curb, 6′ and 8′ wide 4.5" thick concrete trails, and exercise equipment. This project is intended for the construction of a fitness court.