The work consists of the installation of an electronic scoreboard with outdoor sponsor panels including but not limited to the installation of two wide falnge support columns with concrete footings, installation of electrical 120- volt, 20 amp 60 hz grounded AC circuit connected to a power disconnect switch or circuit breaker, conduit and lines from the nearest existing electrical source...