Provide all materials, labor, hardware, tools and equipment necessary to install District-Furnished Material which consists of anode cables through the Transbay Tube top hat and Anode Array Assemblies in the San Francisco Bay; repair existing facilities if needed to provide functional impressed current anode installation for BART's Transbay Tube; and installation of up to 14 anode cables through the Transbay Tube top hats along with Anode Array Assemblies as directed by the BART Engineer. Contractor shall provide all coordination required with the U.S. Coast Guard and with the Port of Oakland, as applicable and as indicated in the Contract Documents.