The intent is to obtain the services of a qualified contractor to provide installation, maintenance and repair services for the rain cover installed at the Solid Waste Management Facility. The rain cover is installed to control erosion, control surface water infiltration and provide an interim cover prior to permanent closure of landfill cells.