This document has expired, therefore the above link may no longer work.

A MANDATORY pre-bid meeting is scheduled for Tuesday, June 8, 2010. The Contractor shall provide all labor, parts, material, components, and equipment necessary to install a 10-Ton split electric cooling system at the Regional Youth Detention Center (RYDC). The unit will be provided by the contractor and shall be a Carrier or approved equal. All product substitution requests must be made no later than the date and time of the mandatory Pre-bid meeting.