Mandatory pre-bid meeting 03/04/2010.
Bid is open to prequalified bidders.
A. Requirements included:
1. Be responsible for all cutting, fitting, and patching, including attendant excavation and
backfill required to complete work or:
a. Make several parts fit together correctly.
b. Uncover portions of work to provide for installation of ill-timed work.
c. Remove and replace defective work.
d. Remove and replace work not conforming to Contract Documents requirements.
e. Remove samples of installed work as specified for testing.
f. Provide routine penetrations of non-structural surfaces for installation of piping and
electrical conduit.