The scope of work for the incineration process is expected to be significantly less than for the incineration process. In general, the preliminary design for both includes five tasks: task 1 will include information gathering, analysis, and the refinement of project goals; task 2 will include an assessment of the incineration process; task 3 will provide a technical and Business Case Evaluation (BCE) integral to the Preliminary Design Report (PDR); task 4 will deliver a Draft Preliminary Design Report and Design Drawings; and task 5 will deliver a final PDR.