Mandatory pre-bid meeting 05/03/2010.
Modernize four (4) geared Passenger Elevators (Elevators #1 - #4) in The
Center on the campus. Modernization work to include:
replacement of operating systems and drives; modifications to existing signal fixtures; addition of
rope gripper devices and any other items required to bring systems up to ASME A17.1 2007
requirements. Door operators, governors, safeties, buffers, car sling and platform to be reused.