IRON CREEK THINNING PROJECT 2014
IN APPROXIMATELY 1 DAY, THE SOLICITATION FOR THIS COMMERCIAL SSERVICE PROJECT WILL BE AVAILABLE TO VIEW AND PRINT.
SCOPE OF WORK
The intent of this contract is to secure services for hazardous fuels reduction on the Sawtooth National Recreation Area of the Sawtooth National Forest. The project includes the cutting and piling of ladder fuels (trees less than four inches in diameter at breast height) as well as cutting of all dead standing trees (and piling all material associated with those dead trees which is less than four inches in diameter) which the contractor will then be obligated to move all salvageable firewood to roadside for firewood permittee removal. The contractor will also be required to pile all existing materials within the project boundary existing from previous activities.
LOCATION
The project area is located along the Iron Creek Subdivision access road approximately 3.5 miles from Stanley Idaho. The Iron Creek road is 2.5 miles west of the Highway 21 and Highway 75 intersection in Stanley. Heading south on Iron Creek Road FS619 the project area is the first road to the left. Legal description is: NE ¼ Township 10N., Range 13E. Section 7
CONTACT JIM RINEHOLT AT (208) 727-5021 FOR MORE INFORMATION.
CONTRACT TIME WILL BE 120 calendar days with an estimated start date of 07/30/2014. NAICS Code: 115310 Size Standard: $17.5. This proposed procurement is a TOTAL SMALL BUSINESS set-aside.
KAREN L. MORTHLAND, Phone 2083734115, Email [email protected] - JIM RINEHOLT, Phone 208-727-5021, Email [email protected]