This project includes saw cutting existing ramp at roadway, remove and replace asphalt, install electrical conduit for future rolling gate, and striping.
The solicitation for this project will be posted on or around 06/20/2014.
Leslie L. Solberg, Contracting Officer, Phone 208-765-7433, Fax 208-765-7229, Email [email protected] - Scott Jackson, Technical, Phone 208-769-3015, Email [email protected]