A. Provide all labor and material to install a complete and usable 15KW Off-Grid Hybrid system. The Hybrid system shall consist of:
1. Two 5KW Vertical Axis Wind Turbine for a total of 10KW. Each turbine shall have its own inverter and hurricane rated tie-downs.
2. One 5KW solar photovoltaic system
3. One battery bank suitable for 1 day of autonomy
B. The Contractor shall supply all necessary equipment and material (such as and not limited to: inverters, combiner boxes, fuse boxes, controller, wiring, and ground mounted racks) in order to provide a complete and fully functional system.
Hubert M Cacho, 210 295 6545
Mission Division (PARC Americas 410th CSB)