INSTALLATION OF A 15KW HYBRID RENEWABLE SYSTEM


Texas, United States
Government : Military
RFP
Go to the link
This document has expired, therefore the above link may no longer work.

A.    Provide all labor and material to install a complete and usable 15KW Off-Grid Hybrid system. The Hybrid system shall consist of:

1.    Two 5KW Vertical Axis Wind Turbine for a total of 10KW. Each turbine shall have its own inverter and hurricane rated tie-downs.
2.    One 5KW solar photovoltaic system
3.    One battery bank suitable for 1 day of autonomy

B.    The Contractor shall supply all necessary equipment and material (such as and not limited to: inverters, combiner boxes, fuse boxes, controller, wiring, and ground mounted racks) in order to provide a complete and fully functional system.


Hubert M Cacho, 210 295 6545

Mission Division (PARC Americas 410th CSB)