Fog Mountain Road 319 Resurfacing - The item includes conditioning roadway, hauling from a commercial source and placing 2" of aggregate, drainage improvements, open top cross drain removal and re-install.
Indian Hill Road 290 Fill Slope Repair - The item includes repairing fill failure, placing geotextile cloth, removing and installing a 24" culvert, installing a down spout and hauling Class 5 riprap from a commercial source.
Optional Item Indian Hill Road 290 Resurfacing - this item includes conditioning roadway and hauling from a commercial source and placing 2" of aggregate, drainage improvements, open top cross drain removal and re-install.
The project is located on the Moose Creek Ranger District. Road No. 310 is in T. 31 N and T. 32 N., R. 9 E., Boise Meridian, Idaho County, Idaho. Road No. 290 is in T. 31 N., R 9 E. and R 10 E., Boise Meridian, Idaho County, Idaho.
The price range is between $100,000 and $250,000
The period of performance will be September 1, 2014 through October 15, 2014.