The US Fish and Wildlife Region 5, has a *********** to repair the approximate 50 foot wide breach in the 7-foot high ********** dam, and a new emergency The dam repairs will enable the dam to safely pass the inflow design flood, the ******** rainfall event, without ************* The total is approximately 5,000 CY of soil and rock/boulder. Suitable d materials will be used to raise the existing ********** dam height approximately 2.6 feet along most of the 1900-foot long dam. In addition, the existing 1-foot wide concrete walls of the outlet (service spillway) will be raised 1.6 feet to match the increased dam height...