The principal components of the work to be performed under these specifications includes removal and disposal of existing wire mesh, clearing and grubbing, debris removal along roadway, and existing energy dissipating fence, rock scaling, rock removal, rock bolting, and furnishing and installing new wire mesh along the right abutment.
Cagle, Heather