The work under this Contract shall consist of: intermittent pavement repairs, partial depth, involving the full lane width mainline pavement partial depth removal and the replacement with hot-mix asphalt materials; longitudinal joint repairs, involving mainline pavement partial depth pavement removal and replacement of deteriorated with hot-mix asphalt materials along pavement joints; restriping of main line pavements and re-establishing pavement markings as needed with the attentive work areas together with the maintenance of traffic necessary to provide a safe and complete work zone.